Todays goals:
- pull both the ups and the external battery unit (EBU).
- While there, swap them so the UPS is on top.
- Take photos of the wiring.
- Disconnect each battery.
- Measure it.
- Replace anything not like the others.
- Expecting 13V or so on most.
- One should read way less.
- Maybe. But the UPS is now charged to 100%
All cells in the UPS measure about 13.4V.
Next, the EBU. All aboutt 13.4 or 13.35V.
Everything reassembled. No action taken.